maintenancepm
Preventive maintenance schedules for MNMUK machine shop equipment. Covers DMG MORI, CITIZEN, MITSUBISHI EDM, Haas, and support equipment. USE WHEN user asks 'PM schedule', 'maintenance', 'service due', 'machine maintenance', 'what maintenance', or 'TPM checklist'.
- Installs
- 55
- Last 24h
- —
- Trending rank
- —
- Security
- Not audited
Install
Works with every agent the skills CLI supports.
npx skills add https://github.com/robdtaylor/personal-ai-infrastructure --skill maintenancepm- 01
Install
Run the command in your project. The CLI asks which agents to install for.
- 02
Describe the task
Ask your agent for something this skill covers. It loads maintenancepm automatically when relevant.
- 03
Review the result
The agent follows the SKILL.md steps, scripts and references bundled with the skill.
SKILL.md
The instructions your agent reads when the skill is triggered.
MaintenancePM - Preventive Maintenance System
Purpose: Protect capital equipment investment through systematic preventive maintenance.
When to Activate
- "What's the PM schedule for NLX2500?"
- "Create maintenance checklist"
- "What's due for service?"
- "TPM checklist for Swiss machines"
- "Maintenance history for [machine]"
- "PM planning"
Maintenance Philosophy
Total Productive Maintenance (TPM)
| Level | Responsibility | Frequency | Examples |
|---|---|---|---|
| Operator | Daily/Shift | Every shift | Cleaning, lubrication, visual checks |
| Technician | Weekly/Monthly | Scheduled | Filter changes, calibration, adjustments |
| Specialist | Quarterly/Annual | Planned | Major service, rebuilds, alignments |
| OEM | As required | Scheduled | Warranty service, major repairs |
DMG MORI Machines
Daily Checks (Operator - Every Shift)
# Daily PM Checklist - DMG MORI
Machine: _____________ Date: _________ Operator: _________
## Start of Shift
| Check | OK | Issue | Notes |
|-------|-----|-------|-------|
| Coolant level | ☐ | ☐ | |
| Coolant concentration (refractometer) | ☐ | ☐ | Target: ___% |
| Hydraulic oil level | ☐ | ☐ | |
| Way lube level | ☐ | ☐ | |
| Air pressure (6 bar min) | ☐ | ☐ | |
| Chip conveyor clear | ☐ | ☐ | |
| Guards/doors function | ☐ | ☐ | |
| No unusual noises | ☐ | ☐ | |
| Spindle warm-up complete | ☐ | ☐ | |
## End of Shift
| Task | Done | Notes |
|------|------|-------|
| Clean machine exterior | ☐ | |
| Remove chips from work area | ☐ | |
| Wipe down way covers | ☐ | |
| Return tools to crib | ☐ | |
| Report any issues | ☐ | |
Signature: _____________
Weekly PM - DMG MORI Mills (NMV3000, DMU50, NHX500)
# Weekly PM - DMG MORI 5-Axis Mill
Machine: _____________ Week: _________ Tech: _________
| Task | Done | Reading/Notes |
|------|------|---------------|
| Check spindle runout | ☐ | TIR: ___μm (max 5μm) |
| Inspect tool changer | ☐ | |
| Clean coolant tank strainer | ☐ | |
| Check way lube distribution | ☐ | |
| Inspect pallet changer (if equipped) | ☐ | |
| Verify probe calibration | ☐ | |
| Check air dryer/filter | ☐ | |
| Inspect chip conveyor belt | ☐ | |
| Check hydraulic filter indicator | ☐ | |
| Clean control cabinet filter | ☐ | |
## Pallet System (NMV3000/DMU50)
| Task | Done | Notes |
|------|------|-------|
| Check pallet locating surfaces | ☐ | |
| Verify pallet clamping | ☐ | |
| Lubricate pallet transfer | ☐ | |
Issues Found: ___________________________________
Action Taken: ___________________________________
Weekly PM - DMG MORI Lathes (NLX2500, ALX2000)
# Weekly PM - DMG MORI Turning Centre
Machine: _____________ Week: _________ Tech: _________
| Task | Done | Reading/Notes |
|------|------|---------------|
| Check chuck clamping pressure | ☐ | Main: ___bar Sub: ___bar |
| Inspect turret indexing | ☐ | |
| Check tailstock alignment (if used) | ☐ | |
| Verify bar feeder operation | ☐ | |
| Clean chip conveyor | ☐ | |
| Check coolant nozzle positioning | ☐ | |
| Inspect sub-spindle (NLX2500) | ☐ | |
| Verify tool sensor operation | ☐ | |
| Check hydraulic pressure | ☐ | ___bar |
| Clean/replace coolant filter | ☐ | |
Live Tooling Check:
| Task | Done | Notes |
|------|------|-------|
| Check live tool runout | ☐ | TIR: ___μm |
| Lubricate live tool holders | ☐ | |
| Verify C-axis indexing | ☐ | |
Monthly PM - All DMG MORI
# Monthly PM - DMG MORI
Machine: _____________ Month: _________ Tech: _________
## Lubrication
| Task | Done | Notes |
|------|------|-------|
| Check/top up way lube reservoir | ☐ | Level: ___% |
| Verify lube pump operation | ☐ | |
| Grease linear guide wipers | ☐ | |
| Lubricate ball screws (if manual) | ☐ | |
## Hydraulics
| Task | Done | Notes |
|------|------|-------|
| Check hydraulic oil level | ☐ | |
| Inspect for leaks | ☐ | |
| Check pressure gauge accuracy | ☐ | |
## Coolant System
| Task | Done | Notes |
|------|------|-------|
| Clean coolant tank thoroughly | ☐ | |
| Replace coolant filters | ☐ | |
| Check pump operation | ☐ | |
| Verify through-spindle pressure | ☐ | ___bar |
## Electrical
| Task | Done | Notes |
|------|------|-------|
| Clean control cabinet (air blow) | ☐ | |
| Check fan operation | ☐ | |
| Inspect cables for damage | ☐ | |
## Accuracy Check
| Measurement | Spec | Actual | Pass |
|-------------|------|--------|------|
| Spindle runout | <5μm | | ☐ |
| Axis backlash X | <5μm | | ☐ |
| Axis backlash Y | <5μm | | ☐ |
| Axis backlash Z | <5μm | | ☐ |
Annual PM - DMG MORI
| Task | Interval | Last Done | Next Due | Notes |
|---|---|---|---|---|
| Ball screw inspection | Annual | OEM or trained tech | ||
| Spindle bearing check | Annual | Vibration analysis | ||
| Geometric alignment | Annual | Laser or ballbar | ||
| Hydraulic oil change | Annual/2000hr | |||
| Way lube oil change | Annual | |||
| Coolant full change | 6 months | |||
| Encoder battery | 2 years | CRITICAL | ||
| Control backup | Annual |
HARDINGE Precision Lathe
Daily - Operator
# Daily PM - HARDINGE
| Check | OK | Issue |
|-------|-----|-------|
| Spindle warm-up (20 min) | ☐ | ☐ |
| Collet/chuck cleanliness | ☐ | ☐ |
| Coolant level and temp | ☐ | ☐ |
| Air pressure | ☐ | ☐ |
| No unusual vibration | ☐ | ☐ |
Weekly - Precision Checks
# Weekly PM - HARDINGE
| Task | Done | Reading |
|------|------|---------|
| Spindle runout check | ☐ | TIR: ___μm (max 2μm) |
| Temperature log start/end | ☐ | Start: ___°C End: ___°C |
| Collet concentricity | ☐ | TIR: ___μm |
| Sub-spindle alignment | ☐ | |
CITIZEN Swiss Machines
Daily - Operator
# Daily PM - CITIZEN Swiss
Machine: [ ] Laser Head [ ] LFV
Date: _________ Operator: _________
| Check | OK | Issue | Notes |
|-------|-----|-------|-------|
| Oil level | ☐ | ☐ | |
| Oil temperature | ☐ | ☐ | Target: 25-30°C |
| Guide bushing condition | ☐ | ☐ | |
| Bar stock quality | ☐ | ☐ | |
| Chip evacuation | ☐ | ☐ | |
| Air pressure (5 bar) | ☐ | ☐ | |
| Mist collector filter | ☐ | ☐ | |
| Part catcher clear | ☐ | ☐ | |
Weekly - Swiss Specific
# Weekly PM - CITIZEN Swiss
| Task | Done | Notes |
|------|------|-------|
| Clean guide bushing area | ☐ | |
| Check guide bushing wear | ☐ | |
| Inspect collet condition | ☐ | |
| Verify gang tool alignment | ☐ | |
| Check back-working tools | ☐ | |
| Clean oil filter | ☐ | |
| Verify LFV operation (if equipped) | ☐ | |
| Check laser alignment (if equipped) | ☐ | |
| Inspect bar feeder | ☐ | |
| Check sub-spindle pickup | ☐ | |
Oil Analysis (Monthly):
| Parameter | Spec | Actual | Pass |
|-----------|------|--------|------|
| Contamination | <NAS 8 | | ☐ |
| Water content | <0.1% | | ☐ |
| Viscosity | ±10% | | ☐ |
Monthly - CITIZEN
| Task | Done | Notes |
|---|---|---|
| Full oil tank clean | ☐ | |
| Replace oil filter element | ☐ | |
| Guide bushing replacement (if worn) | ☐ | |
| Check Z-axis gibs | ☐ | |
| Verify spindle accuracy | ☐ | |
| Clean electrical cabinet | ☐ |
MITSUBISHI EDM
Daily - Wire EDM
# Daily PM - MITSUBISHI Wire EDM
Date: _________ Operator: _________
| Check | OK | Issue |
|-------|-----|-------|
| Dielectric level | ☐ | ☐ |
| Dielectric conductivity | ☐ | ☐ | Reading: ___μS |
| Wire path clear | ☐ | ☐ |
| Filter pressure | ☐ | ☐ |
| Wire guides condition | ☐ | ☐ |
| Flushing nozzles clear | ☐ | ☐ |
| Wire tension | ☐ | ☐ |
| Auto-threader operation | ☐ | ☐ |
Daily - Spark EDM
# Daily PM - MITSUBISHI Spark EDM
Date: _________ Operator: _________
| Check | OK | Issue |
|-------|-----|-------|
| Dielectric level | ☐ | ☐ |
| Dielectric clarity | ☐ | ☐ |
| Filter condition | ☐ | ☐ |
| Electrode holder clean | ☐ | ☐ |
| Flush pump operation | ☐ | ☐ |
| Fire suppression OK | ☐ | ☐ |
Weekly - Both EDM Types
| Task | Done | Notes |
|---|---|---|
| Check dielectric conductivity | ☐ | Target: 20-40μS |
| Clean/replace filters | ☐ | |
| Inspect wire guides (wire) | ☐ | |
| Check AWT roller condition (wire) | ☐ | |
| Verify axis accuracy | ☐ | |
| Clean work tank | ☐ | |
| Check resin condition | ☐ |
Monthly - EDM
| Task | Done | Notes |
|---|---|---|
| Full dielectric change | ☐ | If contaminated |
| Replace deionizing resin | ☐ | When conductivity rises |
| Wire guide replacement | ☐ | Every 200-400 hrs |
| Power feed contact check | ☐ | |
| Geometric accuracy check | ☐ |
Haas Fast Response Cell
Daily - Operator
# Daily PM - Haas
Machine: [ ] Mini Mill [ ] Tool Room Lathe
| Check | OK | Issue |
|-------|-----|-------|
| Coolant level | ☐ | ☐ |
| Way lube level | ☐ | ☐ |
| Chip tray clear | ☐ | ☐ |
| Air pressure | ☐ | ☐ |
| Tool changer cycle | ☐ | ☐ |
| Spindle warm-up | ☐ | ☐ |
Weekly
| Task | Done | Notes |
|---|---|---|
| Check spindle runout | ☐ | |
| Verify tool changer alignment | ☐ | |
| Clean coolant tank | ☐ | |
| Check way covers | ☐ | |
| Grease as required | ☐ |
Maintenance Schedule Summary
Daily (Every Shift)
| Machine | Key Checks |
|---|---|
| All | Fluid levels, air pressure, visual inspection |
| Mills | Spindle warm-up, tool changer |
| Lathes | Chuck pressure, bar feeder |
| Swiss | Oil temp, guide bushing |
| EDM | Dielectric level/conductivity |
Weekly
| Machine | Key Tasks |
|---|---|
| All | Accuracy checks, filter inspection |
| Mills | Pallet system, probe calibration |
| Lathes | Turret, live tooling |
| Swiss | Guide bushing wear, oil filter |
| EDM | Wire guides, filter change |
Monthly
| Machine | Key Tasks |
|---|---|
| All | Full cleaning, lubrication top-up |
| Mills | Coolant change, accuracy verification |
| Lathes | Hydraulic check, tailstock alignment |
| Swiss | Oil tank clean, full inspection |
| EDM | Resin check, geometric accuracy |
Quarterly
| Machine | Key Tasks |
|---|---|
| All | Major filter replacements |
| Mills | Ballbar test |
| Lathes | Spindle bearing analysis |
| Swiss | OEM service items |
| EDM | Full calibration |
Annual
| Machine | Key Tasks |
|---|---|
| All | Full OEM service, geometry check, major PM |
| All | Backup all programs and parameters |
| All | Hydraulic/lube oil change |
Maintenance Log Template
# Maintenance Log
Machine: _____________
Machine ID: ___________
| Date | Type | Hours | Description | Parts Used | Tech | Time |
|------|------|-------|-------------|------------|------|------|
| | PM | | | | | |
| | Repair | | | | | |
| | PM | | | | | |
Spare Parts Stock
Critical Spares (Keep on-site)
| Machine | Item | Qty | Lead Time | Supplier |
|---|---|---|---|---|
| All | Coolant filters | 10 | 2 days | |
| All | Way lube filters | 5 | 2 days | |
| Swiss | Guide bushings (common sizes) | 5 ea | 5 days | |
| Swiss | Collets | 3 ea | 3 days | |
| EDM | Wire guides | 2 sets | 5 days | |
| EDM | Resin | 1 unit | 3 days | |
| EDM | Filters | 10 | 2 days | |
| All | Encoder batteries | 2 | 3 days | CRITICAL |
Order Lead Times
| Supplier | Type | Typical Lead |
|---|---|---|
| DMG MORI | Spare parts | 3-10 days |
| CITIZEN | Spare parts | 5-14 days |
| MITSUBISHI | EDM parts | 3-7 days |
| Haas | Spare parts | 3-7 days |
MTBF Calculation & Data-Driven PM Intervals
How to Calculate MTBF
MTBF (Mean Time Between Failures) = Total Operating Hours ÷ Number of Failures
Example: Machine runs 2,000 hours and has 4 breakdowns → MTBF = 500 hours
Setting PM Intervals from MTBF
| MTBF Result | Recommended PM Interval | Rationale |
|---|---|---|
| MTBF = 500 hrs | PM at 350 hrs (70% of MTBF) | Intervene before predicted failure |
| MTBF = 200 hrs | PM at 140 hrs (70% of MTBF) | High-failure item needs more frequent checks |
| MTBF = 1000 hrs | PM at 700 hrs (70% of MTBF) | Reliable item, less frequent PM justified |
Rule: Set PM interval = 70% × MTBF to catch deterioration before failure occurs.
MTBF Tracking Template
# Downtime Log - [Month]
| Date | Machine | Start | End | Hours | Cause | Action | Category |
|------|---------|-------|-----|-------|-------|--------|----------|
| | | | | | | | PM/Breakdown/Setup |
## Monthly Summary
| Category | Hours | % of Total |
|----------|-------|------------|
| Planned PM | | |
| Breakdown | | |
| Waiting Parts | | |
| Other | | |
| **Total** | | |
## Machine Availability
| Machine | Available Hrs | Downtime | Availability % |
|---------|---------------|----------|----------------|
| | | | |
Target: >95% Availability
Workflow Routing
| Trigger | Action |
|---|---|
| "PM schedule for [machine]" | Look up machine section, output relevant interval checklists |
| "What's due for service?" | Present Maintenance Schedule Summary tables |
| "Create maintenance checklist" | Generate daily/weekly/monthly checklist for named machine |
| "TPM checklist" | Output TPM level table + appropriate operator checklist |
| "Maintenance history" | Provide Maintenance Log Template |
| "Spare parts / what to stock" | Output Critical Spares table |
| "MTBF / PM intervals" | Explain MTBF calculation, provide tracking template |
Examples
Example 1 — PM schedule lookup
"What's the weekly PM for the NLX2500?" Responds with the Weekly PM - DMG MORI Turning Centre checklist including chuck pressure, turret indexing, bar feeder, coolant filter, and live tooling checks.
Example 2 — Upcoming service
"What maintenance is due this month for the CITIZEN Swiss?" Responds with the Monthly CITIZEN checklist: full oil tank clean, replace oil filter element, guide bushing check, Z-axis gibs, spindle accuracy, and cabinet cleaning.
Example 3 — TPM checklist generation
"Generate a daily TPM checklist for the Mitsubishi Wire EDM" Responds with the Daily PM - MITSUBISHI Wire EDM checklist covering dielectric level, conductivity, wire path, filter pressure, guides, flushing nozzles, wire tension, and auto-threader.
Example 4 — MTBF-based interval
"Our NMV3000 has had 4 breakdowns in 2000 hours. What PM interval should we use?" Calculates MTBF = 500 hours, recommends PM at 350 hours (70% × MTBF rule), and suggests updating the Monthly PM frequency accordingly.
Integration
- PlantCapability: Factor maintenance windows into capacity
- SkillsMatrix: Who is trained for which PM tasks
- TribalKnowledge: Capture maintenance tips and tricks
- OEETracker: Availability component of OEE
FAQ
What does the maintenancepm skill do?
Preventive maintenance schedules for MNMUK machine shop equipment. Covers DMG MORI, CITIZEN, MITSUBISHI EDM, Haas, and support equipment. USE WHEN user asks 'PM schedule', 'maintenance', 'service due', 'machine maintenance', 'what maintenance', or 'TPM checklist'.
How do I install maintenancepm?
Run npx skills add https://github.com/robdtaylor/personal-ai-infrastructure --skill maintenancepm in your project. The skills CLI detects the agents you use and copies the skill into the right folder. For Claude Code you can also place the skill folder at ~/.claude/skills/maintenancepm/ (personal) or .claude/skills/maintenancepm/ (project).
Which AI agents can use maintenancepm?
Any agent that supports the open Agent Skills format (a folder with a SKILL.md file), including Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, Windsurf, Cline, OpenCode and more.
Is maintenancepm safe to install?
No partner security audit is available yet. Skills can run commands and scripts, so read the SKILL.md and any bundled files before installing.
Who maintains maintenancepm?
It is published by robdtaylor in robdtaylor/personal-ai-infrastructure. It has 55 recorded installs.
More from robdtaylor/personal-ai-infrastructure
businessstrategy
robdtaylor/personal-ai-infrastructure
MBA-trained business strategist with full commercial awareness. USE WHEN user says 'business plan', 'financial analysis', 'P&L', 'cash flow', 'valuation', 'market analysis', 'competitive analysis', 'SWOT', 'business model', 'unit economics', 'fundraising', 'pitch deck', or needs strategic business guidance.
structuralfea
robdtaylor/personal-ai-infrastructure
Open the skill to read its SKILL.md instructions.
shippinglogistics
robdtaylor/personal-ai-infrastructure
Open the skill to read its SKILL.md instructions.
supplychain
robdtaylor/personal-ai-infrastructure
Open the skill to read its SKILL.md instructions.
automotivemanufacturing
robdtaylor/personal-ai-infrastructure
Open the skill to read its SKILL.md instructions.
quoteestimator
robdtaylor/personal-ai-infrastructure
Open the skill to read its SKILL.md instructions.
Popular devops & cloud skills
microsoft-foundry
microsoft/azure-skills
Build, deploy, evaluate, optimize, fine-tune, and manage Microsoft Foundry agents, models, and resources end to end. USE FOR: foundry, azd ai agent, azd provision/deploy, hosted agent scaffold/develop/run/deploy/troubleshoot, prompt agent create, managed harness agent create, GitHub Copilot harness agent, create agent, update agent, add tool to agent, invoke agent, agent insights, evaluate agent, batch eval, continuous eval, continuous monitoring, agent CI/CD, optimize prompt, improve prompt, optimize agent instructions, Agent Optimizer scaffold, dataset curation from traces, deploy model, model fine-tuning (SFT/DPO/RFT), Foundry project, RBAC, role assignment, permissions, quota, capacity, region, deployment failure, AI Services, create Foundry resource, knowledge index, customize deployment, onboard, availability, training-data, grader, distillation, large file upload. DO NOT USE FOR: Azure Functions, App Service, general Azure deploy (use azure-deploy), general Azure prep (use azure
azure-diagnostics
microsoft/azure-skills
Debug Azure production issues on Azure using AppLens, Azure Monitor, resource health, and safe triage. WHEN: debug production issues, troubleshoot app service, app service high CPU, app service deployment failure, troubleshoot container apps, container app 503 or target port mismatch, troubleshoot functions, function telemetry missing or stopped after a config/connection-string change, troubleshoot AKS, VM RDP, Linux SSH, VM black screen, can't connect to VM, reset VM password, NSG or firewall blocking, kubectl cannot connect, kube-system/CoreDNS failures, pod pending, crashloop, node not ready, upgrade failures, analyze logs, KQL, insights, image pull failures, cold start issues, health probe failures, resource health, root cause of errors, troubleshoot event hubs, troubleshoot service bus, messaging SDK error, AMQP connection failure, message lock lost, lock renewal during long-running processing, service bus dead letter.
azure-prepare
microsoft/azure-skills
Prepare azd-based Azure projects for deployment: generates azure.yaml, infrastructure (Bicep/Terraform), and Dockerfiles for the Azure Developer CLI (azd) workflow. USE ONLY when the user explicitly wants to use azd as the deployment tool, or the project already has an azure.yaml file. DO NOT USE FOR: non-azd deployments, Python App Service code-only deploys (use python-appservice-deploy), or cross-cloud migration (use azure-cloud-migrate). WHEN: prepare app for azd, create azure.yaml, set up azd infrastructure, modernize app for Azure with azd, deploy with azd, function app, timer trigger, service bus trigger, event-driven function, managed identity, generate Bicep, generate Terraform, create and deploy to Azure.
azure-ai
microsoft/azure-skills
Use for Azure AI: Search, Speech, OpenAI, Document Intelligence. Helps with search, vector/hybrid search, speech-to-text, text-to-speech, transcription, OCR. WHEN: AI Search, query search, vector search, hybrid search, semantic search, speech-to-text, text-to-speech, transcribe, OCR, convert text to speech.
azure-deploy
microsoft/azure-skills
Execute Azure deployments for ALREADY-PREPARED applications that have existing .azure/deployment-plan.md and infrastructure files. DO NOT use this skill when the user asks to CREATE a new application — use azure-prepare instead. This skill runs azd up, azd deploy, terraform apply, and az deployment commands with built-in error recovery. Requires .azure/deployment-plan.md from azure-prepare and validated status from azure-validate. WHEN: "run azd up", "run azd deploy", "execute deployment", "push to production", "push to cloud", "go live", "ship it", "bicep deploy", "terraform apply", "publish to Azure", "launch on Azure". DO NOT USE WHEN: "create and deploy", "build and deploy", "create a new app", "set up infrastructure", "create and deploy to Azure using Terraform" — use azure-prepare for these.
azure-validate
microsoft/azure-skills
Pre-deployment validation for Azure readiness. Run deep checks on configuration, infrastructure (Bicep or Terraform), RBAC role assignments, managed identity permissions, and prerequisites before deploying. WHEN: validate my app, check deployment readiness, run preflight checks, verify configuration, check if ready to deploy, validate azure.yaml, validate Bicep, test before deploying, troubleshoot deployment errors, validate Azure Functions, validate function app, validate serverless deployment, verify RBAC roles, check role assignments, review managed identity permissions, what-if analysis, validate Container Apps deployment.