
tool-design-sprint-map-and-target
Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.
- Installs
- 623
- Last 24h
- —
- Trending rank
- —
- Security
- Not audited
Install
Works with every agent the skills CLI supports.
npx skills add https://github.com/product-on-purpose/pm-skills --skill tool-design-sprint-map-and-target- 01
Install
Run the command in your project. The CLI asks which agents to install for.
- 02
Describe the task
Ask your agent for something this skill covers. It loads tool-design-sprint-map-and-target automatically when relevant.
- 03
Review the result
The agent follows the SKILL.md steps, scripts and references bundled with the skill.
SKILL.md
The instructions your agent reads when the skill is triggered.
Design Sprint Map and Target (Monday)
Produce Monday's bundled artifact: the long-term goal that names success in 1-5 years; 3-7 sprint questions converting team fears into testable risks; a 5-15 step customer or system map from key player to outcome; expert interview notes from cameo experts run in parallel; HMW (How Might We) clusters synthesized from the team; and the Decider's chosen target moment. Monday's output becomes Tuesday's design target.
Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.
When to Use
- It is Day 1 of the Design Sprint and the brief is locked (via
tool-design-sprint-brief). - The team is together (in-person, remote, or hybrid) for the full Monday workshop.
- Expert interviews are scheduled for Monday afternoon (cameo role; 15-30 minutes each).
- The team needs to converge from "five days of work ahead" to "this specific target moment is what we're prototyping."
When NOT to Use
- The brief is not locked. Return to
tool-design-sprint-brief; without sprint questions, this skill has nothing to converge toward. - The challenge is so broad that "long-term goal" would be longer than 5 years. Return to problem framing.
- The team is missing the Decider. The target-moment selection at the end of Monday is the Decider's call; without that call the team disperses Tuesday with no agreed direction.
- The team has already pre-decided the target moment. Monday's value is in the convergence; if it's been pre-decided, Monday becomes ratification theater.
What This Skill Produces
A single bundled artifact with six sections:
- Long-term goal: one sentence naming success in 1-5 years. Aspirational; cannot be hit in this sprint, but should be visible from the target moment.
- Sprint questions: 3-7 questions converting team fears into testable risks. Phrased as "Can we... ?" or "Will... ?" or "How... ?"; NOT phrased as solutions.
- Customer or system map: 5-15 step flow from key player(s) at the left to outcome (long-term goal) at the right. Includes major actors, decision points, and current alternatives.
- Expert interview notes: synthesized observations from 2-4 cameo experts interviewed Monday afternoon. Surfaced as HMW candidates for the cluster board.
- HMW cluster board: 30-100+ How Might We notes from the team, clustered into 4-8 themes; voted with
tool-note-and-voteheat-map mechanic to surface top clusters. - Target moment: the single point on the map (or a tight cluster of points) the Decider picks as the prototyping target. Wednesday's storyboard begins from here.
See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Monday artifact.
Inference Inputs
| Input | What the skill does with it |
|---|---|
Sprint brief (from tool-design-sprint-brief) | Pulls the locked sprint questions as seed for refinement; pulls the challenge statement as the long-term goal seed; pulls the team roster for role assignments in note-and-vote |
| Existing research | Used to draft the customer or system map; researcher walks the team through key findings during the map step |
| Analytics | Quantitative grounding for the map's decision-point branch points and abandonment moments |
| Customer examples | Concrete stories used to validate the map's key player and surface map-step gaps |
| Expert interview transcripts (run during Monday) | Synthesized into HMW candidates by the moderator (typically PM or researcher) during the afternoon |
Monday Time Structure
The full Monday workshop is approximately 7 hours (09:00-12:30 + 13:30-17:00). The skill's bundled artifact emerges across the day:
- 09:00-09:30: Welcome + brief recap + introductions (does not produce artifact content)
- 09:30-10:30: Long-term goal (one sentence) + draft sprint questions (3-7)
- 10:30-12:30: Customer or system map draft (continuous-flow whiteboard work; team builds together)
- 12:30-13:30: Lunch + first expert interview slot (cameo)
- 13:30-15:30: Remaining expert interviews (3 slots; 25 min each); team captures HMWs continuously during interviews
- 15:30-16:30: HMW cluster board synthesis; team adds final HMWs; Facilitator clusters; team heat-map votes via
tool-note-and-vote - 16:30-17:00: Decider picks target moment; signs off; team disperses for Tuesday sketches
This skill's 105-minute timebox covers the facilitated synthesis sections (long-term goal + sprint questions + map draft + HMW clustering + target selection). Expert interviews and silent map-extension work happen in parallel and are not counted in the timebox.
Common Pitfalls
- Long-term goal too short. "Ship Brainshelf MVP by Q3" is a roadmap goal, not a long-term goal. The long-term goal is 1-5 years out and aspirational ("Become the default way 25+/year readers remember and recall books").
- Sprint questions phrased as solutions. "Build the camera-capture flow" is a solution; "Can we get sub-3-second capture without abandonment?" is a sprint question. The team must convert fears into questions, not predetermined answers.
- Map too detailed. 5-15 steps, not 50. The map is for Decider orientation, not engineering documentation. If the map balloons, the Facilitator forces compression.
- Skipping HMW because "we already know the opportunities." HMW's value is divergent surfacing followed by convergent voting. Pre-deciding the opportunities skips both halves.
- Decider absent at target-moment selection. The whole point of Monday is the Decider's target choice. If the Decider must leave early, target selection must happen before they leave, even if HMW clustering compresses.
- Expert interviews skipped or run by the wrong person. Experts bring outside context the team can't generate internally. Skipping them produces an inward-looking Monday. Running them as group calls (instead of small cameo conversations) wastes expert time and produces less useful HMW input.
Cross-Skill Usage
Prerequisites: tool-design-sprint-brief. Map-and-Target consumes the locked sprint brief and refines the sprint questions during the morning. Without a brief, this skill has no convergence target.
This skill invokes tool-note-and-vote twice during the day: once for HMW cluster heat-map voting (anonymous dot-voting to surface top 4-8 clusters) and optionally once for target-moment supervote when the Decider wants team input before deciding. The Decider's call is final regardless of team vote distribution.
Next invocation in the sprint: tool-design-sprint-sketch Tuesday morning.
Canonical Sources
- Knapp, J., Zeratsky, J., and Kowitz, B. Sprint. Simon and Schuster, 2016. Monday chapter (Chapters 4-7).
- GV Design Sprint Guide. "Sprint Week Monday." https://www.gv.com/sprint/
- Character Capital. "Design Sprint Day 1." https://www.character.vc
- Google Design Sprint Kit. "Monday agenda template." https://designsprintkit.withgoogle.com/
Decider Checkpoint
This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider's call at the end of Monday is target-moment selection: a single point (or tight cluster of points) on the customer or system map that becomes Tuesday's design target. Without that selection, Tuesday's sketches diverge with no shared direction. The Decider also confirms the long-term goal, the sprint questions, and the top HMW clusters; these become Wednesday's heat-map orientation.
FAQ
What does the tool-design-sprint-map-and-target skill do?
Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.
How do I install tool-design-sprint-map-and-target?
Run npx skills add https://github.com/product-on-purpose/pm-skills --skill tool-design-sprint-map-and-target in your project. The skills CLI detects the agents you use and copies the skill into the right folder. For Claude Code you can also place the skill folder at ~/.claude/skills/tool-design-sprint-map-and-target/ (personal) or .claude/skills/tool-design-sprint-map-and-target/ (project).
Which AI agents can use tool-design-sprint-map-and-target?
Any agent that supports the open Agent Skills format (a folder with a SKILL.md file), including Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, Windsurf, Cline, OpenCode and more.
Is tool-design-sprint-map-and-target safe to install?
No partner security audit is available yet. Skills can run commands and scripts, so read the SKILL.md and any bundled files before installing.
Who maintains tool-design-sprint-map-and-target?
It is published by product-on-purpose in product-on-purpose/pm-skills. It has 623 recorded installs.
More from product-on-purpose/pm-skills
deliver-acceptance-criteria
product-on-purpose/pm-skills
Generates structured Given/When/Then acceptance criteria for a user story or feature slice, covering the happy path, key failure scenarios, and non-functional expectations in testable form. Use when turning requirements into verifiable scenarios for engineering handoff and QA sign-off. For a dedicated catalog of boundary conditions, error states, and recovery paths across a feature, use deliver-edge-cases; to write the stories themselves, use deliver-user-stories.
deliver-prd
product-on-purpose/pm-skills
Creates a comprehensive Product Requirements Document that aligns stakeholders on what to build, why, and how success will be measured. Use when specifying features, epics, or product initiatives for engineering handoff.
deliver-user-stories
product-on-purpose/pm-skills
Generates user stories in the standard persona, action, benefit story format from product requirements or feature descriptions. Use when breaking a feature into stories for sprint planning, writing tickets, or communicating scope to engineering. For testable Given/When/Then acceptance criteria on a story, use deliver-acceptance-criteria; for boundary and failure scenarios, use deliver-edge-cases.
deliver-edge-cases
product-on-purpose/pm-skills
Documents edge cases, error states, boundary conditions, race conditions, and recovery paths for a feature - the systematic catalog of what can go wrong and the failure modes to design for. Use during specification to map the failure surface and ensure comprehensive coverage, or during QA planning to identify boundary and limit scenarios to test. Distinct from deliver-acceptance-criteria, which writes story-level Given/When/Then checks; this skill produces the whole-feature edge-case catalog.
discover-competitive-analysis
product-on-purpose/pm-skills
Creates a structured competitive analysis comparing features, pricing, and positioning across 3-5 direct and indirect competitors, with a 2x2 map and actionable strategic recommendations. Use before entering a market, planning differentiation, or after losing deals. For market size rather than competitor positioning, use discover-market-sizing instead.
define-problem-statement
product-on-purpose/pm-skills
Creates a clear problem framing document with user impact, business context, and success criteria. Use when starting a new initiative, realigning a drifted project, or communicating up to leadership.
Popular docs & writing skills
grill-with-docs
mattpocock/skills
A relentless interview to sharpen a plan or design, which also creates docs (ADR's and glossary) as we go.
lark-markdown
open.feishu.cn
飞书 Markdown:查看、创建、上传、编辑和比较飞书中的原生 Markdown 文件。当用户要操作飞书 Markdown 文件,或比较其远端版本及本地草稿时使用。纯本地 Markdown 文件操作不触发本 skill。不负责将 Markdown 导入为飞书在线文档,也不负责文件搜索、权限、评论、移动、删除等云空间管理操作。
writing-beats
mattpocock/skills
Writing, exploit; assemble raw material into a journey of beats, grounding each term before a beat leans on it.
writing-shape
mattpocock/skills
Writing, exploit: shape raw material into an article, paragraph by paragraph.
writing-fragments
mattpocock/skills
Writing, explore: mine raw fragments, no structure yet.
writing-for-agents
mattpocock/skills
Writing documents for agents. Use when creating or editing skills, or modifying AGENTS.md or CLAUDE.md.