status-report-template

Эксперт по статус-отчётам. Используй для создания шаблонов отчётов, executive summaries и project dashboards.

Installs
82
Last 24h
—
Trending rank
—
Security
Not audited

Install

Works with every agent the skills CLI supports.

npx skills add https://github.com/dengineproblem/agents-monorepo --skill status-report-template
  1. 01

    Install

    Run the command in your project. The CLI asks which agents to install for.

  2. 02

    Describe the task

    Ask your agent for something this skill covers. It loads status-report-template automatically when relevant.

  3. 03

    Review the result

    The agent follows the SKILL.md steps, scripts and references bundled with the skill.

SKILL.md

The instructions your agent reads when the skill is triggered.

Status Report Template Generator

Эксперт по созданию эффективных статус-отчётов для проектной коммуникации на всех уровнях организации.

Core Principles

Foundational Requirements

effective_status_report:
  principles:
    - name: "Consistent Formatting"
      description: "Use consistent structure and hierarchy across all reports"

    - name: "Audience-Specific"
      description: "Tailor depth and focus to reader's needs"

    - name: "Traffic Light System"
      description: "Green/Yellow/Red for quick visual assessment"

    - name: "Data-Driven"
      description: "Include specific dates, percentages, measurable outcomes"

    - name: "Actionable"
      description: "Clear next steps with ownership and deadlines"

    - name: "Honest"
      description: "Direct communication about issues while maintaining professionalism"

Audience Differentiation

AudienceFocusDepthFrequency
ExecutiveBusiness impact, strategic alignmentHigh-level metricsWeekly/Monthly
TeamOperational details, blockersDetailed tasksDaily/Weekly
ClientDeliverables, timelineBalanced detailWeekly
BoardStrategic metrics, risksExecutive summaryMonthly/Quarterly
StakeholdersRelevant updates, decisions neededCustomizedAs needed

Standard Templates

Executive Summary Template

# Project Status Report: [Project Name]
**Report Date:** [Date]
**Reporting Period:** [Start Date] - [End Date]
**Report Author:** [Name]

---

## Executive Summary

### Overall Status: 🟢 GREEN / 🟡 YELLOW / 🔴 RED

| Dimension | Status | Trend |
|-----------|--------|-------|
| Schedule  | 🟢 On Track | ↗️ Improving |
| Budget    | 🟡 At Risk | → Stable |
| Scope     | 🟢 On Track | → Stable |
| Quality   | 🟢 On Track | ↗️ Improving |

### Key Highlights
1. [Major accomplishment with measurable impact]
2. [Important milestone reached]
3. [Significant decision made]

### Attention Required
1. **[Issue]** - [Impact] - Decision needed by [Date]
2. **[Risk]** - [Mitigation status] - Escalation: [Yes/No]

---

## Decisions Needed

| Decision | Owner | Deadline | Impact if Delayed |
|----------|-------|----------|-------------------|
| [Decision description] | [Name] | [Date] | [Impact] |

Progress Tracking Section

## Progress Summary

### Completed This Period
| Task | Owner | Completed | Impact |
|------|-------|-----------|--------|
| [Task name] | [Name] | [Date] | [Business impact] |
| [Task name] | [Name] | [Date] | [Business impact] |

### In Progress
| Task | Owner | % Complete | ETA | Status |
|------|-------|------------|-----|--------|
| [Task name] | [Name] | 75% | [Date] | 🟢 On Track |
| [Task name] | [Name] | 40% | [Date] | 🟡 At Risk |

### Upcoming (Next Period)
| Task | Owner | Start Date | Priority |
|------|-------|------------|----------|
| [Task name] | [Name] | [Date] | High |
| [Task name] | [Name] | [Date] | Medium |

### Milestone Tracker
| Milestone | Baseline Date | Current Date | Variance | Status |
|-----------|---------------|--------------|----------|--------|
| Phase 1 Complete | Mar 15 | Mar 15 | 0 days | 🟢 Complete |
| Phase 2 Complete | Apr 30 | May 7 | +7 days | 🟡 At Risk |
| Go Live | Jun 1 | Jun 1 | 0 days | ⬜ Planned |

Risk Management Matrix

## Risk & Issue Management

### Active Risks
| ID | Risk Description | Probability | Impact | Score | Mitigation | Owner | Status |
|----|------------------|-------------|--------|-------|------------|-------|--------|
| R01 | [Risk description] | High | High | 🔴 9 | [Mitigation plan] | [Name] | Monitoring |
| R02 | [Risk description] | Medium | High | 🟡 6 | [Mitigation plan] | [Name] | Mitigating |
| R03 | [Risk description] | Low | Medium | 🟢 2 | [Mitigation plan] | [Name] | Accepted |

**Risk Scoring:** Low=1, Medium=2, High=3 | Score = Probability × Impact

### Active Issues
| ID | Issue Description | Severity | Impact | Resolution Plan | Owner | Target Date |
|----|-------------------|----------|--------|-----------------|-------|-------------|
| I01 | [Issue description] | Critical | [Impact] | [Resolution] | [Name] | [Date] |
| I02 | [Issue description] | Major | [Impact] | [Resolution] | [Name] | [Date] |

### Escalations
| Item | Escalated To | Date | Status | Resolution |
|------|--------------|------|--------|------------|
| [Description] | [Name/Committee] | [Date] | Pending | [Update] |

Financial Summary

## Financial Summary

### Budget Overview
| Category | Budget | Actual | Variance | % Used |
|----------|--------|--------|----------|--------|
| Labor | $500,000 | $475,000 | $25,000 ↓ | 95% |
| Hardware | $100,000 | $98,000 | $2,000 ↓ | 98% |
| Software | $50,000 | $55,000 | -$5,000 ↑ | 110% |
| Contingency | $50,000 | $10,000 | $40,000 ↓ | 20% |
| **Total** | **$700,000** | **$638,000** | **$62,000** | **91%** |

### Burn Rate Analysis
- **Planned Monthly Burn:** $100,000
- **Actual Monthly Burn:** $95,000
- **Trend:** 5% under budget
- **Projected End Cost:** $665,000 (5% under budget)

### Resource Utilization
| Role | Planned Hours | Actual Hours | Utilization |
|------|---------------|--------------|-------------|
| Developers | 800 | 780 | 97.5% |
| QA | 200 | 220 | 110% |
| PM | 160 | 165 | 103% |

Dashboard Templates

Weekly Team Dashboard

# Team Weekly Update: [Team Name]
**Week of:** [Date Range]

## This Week's Focus
🎯 [Primary objective for the week]

## Wins 🏆
- ✅ [Accomplishment 1]
- ✅ [Accomplishment 2]
- ✅ [Accomplishment 3]

## Challenges 🚧
- ⚠️ [Challenge 1] → [Action being taken]
- ⚠️ [Challenge 2] → [Action being taken]

## Team Velocity
| Sprint | Committed | Completed | Velocity |
|--------|-----------|-----------|----------|
| Current | 45 pts | 38 pts | 84% |
| Previous | 40 pts | 42 pts | 105% |
| Average | - | - | 95% |

## Next Week Preview
1. [Priority 1]
2. [Priority 2]
3. [Priority 3]

## Help Needed
- [ ] [Specific request 1] - [From whom]
- [ ] [Specific request 2] - [From whom]

Monthly Executive Dashboard

# Executive Dashboard: [Project/Program Name]
**Period:** [Month Year]

## At a Glance

┌─────────────────────────────────────────────────────────┐ │ SCHEDULE BUDGET SCOPE QUALITY TEAM │ │ 🟢 🟡 🟢 🟢 🟢 │ │ On Track At Risk On Track On Track On Track │ └─────────────────────────────────────────────────────────┘


## OKR Progress

### Objective 1: [Objective Name]
| Key Result | Target | Current | Progress |
|------------|--------|---------|----------|
| KR1: [Description] | 100 | 75 | ████████░░ 75% |
| KR2: [Description] | 50 | 45 | █████████░ 90% |
| KR3: [Description] | 10 | 10 | ██████████ 100% |

### Objective 2: [Objective Name]
| Key Result | Target | Current | Progress |
|------------|--------|---------|----------|
| KR1: [Description] | 500 | 350 | ███████░░░ 70% |

## Strategic Alignment
- **Business Impact:** [Quantified impact on business metrics]
- **Customer Satisfaction:** [NPS or CSAT score change]
- **Revenue Impact:** [Revenue influenced or generated]

## Key Decisions Made
1. [Decision] - [Date] - [Impact]
2. [Decision] - [Date] - [Impact]

## Upcoming Milestones (Next 30 Days)
| Milestone | Date | Dependencies | Confidence |
|-----------|------|--------------|------------|
| [Milestone] | [Date] | [Dependencies] | High |

Advanced Techniques

Trend Analysis Integration

## Performance Trends (3-Month Rolling)

### Schedule Performance Index (SPI)
| Month | Planned Value | Earned Value | SPI | Trend |
|-------|---------------|--------------|-----|-------|
| Jan | $100,000 | $95,000 | 0.95 | - |
| Feb | $200,000 | $195,000 | 0.98 | ↗️ |
| Mar | $300,000 | $305,000 | 1.02 | ↗️ |

**Analysis:** Schedule performance improving. Current trajectory suggests on-time delivery.

### Cost Performance Index (CPI)
| Month | Actual Cost | Earned Value | CPI | Trend |
|-------|-------------|--------------|-----|-------|
| Jan | $100,000 | $95,000 | 0.95 | - |
| Feb | $190,000 | $195,000 | 1.03 | ↗️ |
| Mar | $280,000 | $305,000 | 1.09 | ↗️ |

**Analysis:** Cost efficiency improving. Projecting 5% under budget at completion.

### Velocity Trend

Velocity (Story Points) 50 │ ╭─────╮ 40 │ ╭────╯ ╰──── 30 │────╯ └────────────────────── S1 S2 S3 S4 S5 S6

Visual Health Dashboard

## Project Health Indicators

### Health Matrix
                LOW IMPACT    MED IMPACT    HIGH IMPACT
               ┌────────────┬────────────┬────────────┐

HIGH PROBABILITY │ 🟡 │ 🟠 │ 🔴 │ ├────────────┼────────────┼────────────┤ MED PROBABILITY │ 🟢 │ 🟡 │ 🟠 │ ├────────────┼────────────┼────────────┤ LOW PROBABILITY │ 🟢 │ 🟢 │ 🟡 │ └────────────┴────────────┴────────────┘


### Current Risk Distribution
- 🔴 Critical: 1 (Resource availability)
- 🟠 High: 2 (Integration complexity, Vendor dependency)
- 🟡 Medium: 4
- 🟢 Low: 8

### Quality Metrics
| Metric | Target | Actual | Status |
|--------|--------|--------|--------|
| Defect Density | < 0.5/KLOC | 0.3/KLOC | 🟢 |
| Test Coverage | > 80% | 85% | 🟢 |
| Code Review Coverage | 100% | 100% | 🟢 |
| Critical Bugs | 0 | 0 | 🟢 |

Predictive Elements

## Predictive Analysis

### Completion Forecast
Based on current velocity and remaining scope:

| Scenario | Completion Date | Confidence |
|----------|-----------------|------------|
| Best Case | May 15 | 20% |
| Most Likely | May 28 | 60% |
| Worst Case | Jun 15 | 20% |

**Factors affecting forecast:**
- ↗️ Positive: Team velocity increasing, key risks mitigated
- ↘️ Negative: Scope additions (+15 points), holiday schedule

### Budget Forecast
| Metric | Value |
|--------|-------|
| Budget at Completion (BAC) | $700,000 |
| Estimate at Completion (EAC) | $665,000 |
| Variance at Completion (VAC) | +$35,000 (5% under) |
| To-Complete Performance Index (TCPI) | 0.95 |

### Scope Creep Indicator

Scope Growth Rate 15% │ ╭──── Warning Zone ──── 10% │────╯ 5% │ 0% │════════════════════════ Week 1 2 3 4 5 6

**Current Rate:** 8% | **Threshold:** 10%

Report Types by Context

Client Status Report

# [Project Name] - Client Status Report
**Report #:** [Number]
**Date:** [Date]
**Prepared for:** [Client Name]

## Project Overview
**Overall Status:** 🟢 On Track

We're pleased to report continued progress on [Project Name]. This week, we achieved [key milestone] and remain on track for [upcoming deliverable].

## Deliverable Progress

### Completed Deliverables
| Deliverable | Acceptance Date | Sign-off |
|-------------|-----------------|----------|
| [Deliverable 1] | [Date] | ✅ Approved |
| [Deliverable 2] | [Date] | ✅ Approved |

### In Progress
| Deliverable | Progress | Expected Delivery |
|-------------|----------|-------------------|
| [Deliverable 3] | 75% | [Date] |
| [Deliverable 4] | 40% | [Date] |

## Timeline Update
[Visual timeline or Gantt chart summary]

## Items Requiring Your Input
1. **[Decision Item]**
   - Context: [Brief context]
   - Options: [A, B, C]
   - Recommendation: [Our recommendation]
   - Needed by: [Date]

## Next Steps
- [Action 1] - [Date]
- [Action 2] - [Date]

## Meeting Schedule
- Next Status Call: [Date/Time]
- Demo Session: [Date/Time]

Steering Committee Report

# Steering Committee Report
**Program:** [Program Name]
**Meeting Date:** [Date]
**Prepared by:** [PMO]

## Executive Summary
[2-3 sentence summary of overall program health]

## Program Dashboard

### Portfolio Status
| Project | Status | Budget | Schedule | Key Issue |
|---------|--------|--------|----------|-----------|
| Project A | 🟢 | 🟢 | 🟢 | None |
| Project B | 🟡 | 🟢 | 🟡 | Resource constraint |
| Project C | 🔴 | 🔴 | 🟡 | Vendor delay |

### Resource Allocation
| Resource Pool | Allocated | Available | Utilization |
|---------------|-----------|-----------|-------------|
| Development | 45 | 50 | 90% |
| QA | 12 | 15 | 80% |
| Infrastructure | 8 | 10 | 80% |

## Decisions Required

### Decision 1: [Title]
- **Background:** [Context]
- **Options:**
  - Option A: [Description] - Cost: $X, Risk: Low
  - Option B: [Description] - Cost: $Y, Risk: Medium
- **Recommendation:** Option A
- **Impact of No Decision:** [Consequences]

## Strategic Risks
| Risk | Impact | Mitigation | Owner |
|------|--------|------------|-------|
| [Risk 1] | [Impact] | [Action] | [Name] |

## Financial Summary
- **YTD Spend:** $X of $Y budget (X%)
- **Forecast:** On/Under/Over budget by X%

Best Practices

Do's ✅

best_practices:
  timing:
    - "Send reports consistently (same day/time each period)"
    - "Allow 24 hours for review before meetings"
    - "Distribute before, not during, status meetings"

  content:
    - "Lead with executive summary"
    - "Use data and metrics, not just descriptions"
    - "Include both wins and challenges"
    - "Provide clear action items with owners and dates"
    - "Quantify everything possible"

  formatting:
    - "Use consistent templates across projects"
    - "Apply traffic light colors sparingly and consistently"
    - "Include visual elements for quick scanning"
    - "Keep executive summary to one page"

  distribution:
    - "Create audience-specific versions"
    - "Archive for historical analysis"
    - "Make searchable and accessible"

Don'ts ❌

common_mistakes:
  - mistake: "Burying critical issues"
    impact: "Stakeholders blindsided by problems"
    fix: "Lead with issues requiring attention"

  - mistake: "Activity reporting vs outcome reporting"
    impact: "No clarity on actual progress"
    fix: "Focus on completed deliverables and business impact"

  - mistake: "Vague language"
    impact: "Ambiguity and miscommunication"
    fix: "Use specific numbers, dates, percentages"

  - mistake: "Missing action items"
    impact: "No accountability or follow-through"
    fix: "Every issue needs owner and deadline"

  - mistake: "Over-optimistic assessment"
    impact: "Lost trust when reality emerges"
    fix: "Honest assessment with mitigation plans"

  - mistake: "Too much detail for executives"
    impact: "Key points lost in noise"
    fix: "Executive summary + detailed appendix"

Automation Integration

JIRA Integration Query

-- Sprint progress query for status report
SELECT
    sprint_name,
    COUNT(CASE WHEN status = 'Done' THEN 1 END) as completed,
    COUNT(CASE WHEN status = 'In Progress' THEN 1 END) as in_progress,
    COUNT(CASE WHEN status = 'To Do' THEN 1 END) as todo,
    SUM(CASE WHEN status = 'Done' THEN story_points ELSE 0 END) as completed_points,
    SUM(story_points) as total_points,
    ROUND(SUM(CASE WHEN status = 'Done' THEN story_points ELSE 0 END) * 100.0 /
          NULLIF(SUM(story_points), 0), 1) as completion_percentage
FROM issues
WHERE sprint_id = :current_sprint
GROUP BY sprint_name;

Slack Status Bot Template

// Automated status collection bot
const statusPrompt = {
  blocks: [
    {
      type: "section",
      text: {
        type: "mrkdwn",
        text: "*Weekly Status Update*\nPlease provide your status for the week:"
      }
    },
    {
      type: "input",
      element: {
        type: "plain_text_input",
        action_id: "accomplishments",
        multiline: true,
        placeholder: { type: "plain_text", text: "What did you accomplish?" }
      },
      label: { type: "plain_text", text: "Accomplishments" }
    },
    {
      type: "input",
      element: {
        type: "plain_text_input",
        action_id: "blockers",
        multiline: true,
        placeholder: { type: "plain_text", text: "Any blockers or challenges?" }
      },
      label: { type: "plain_text", text: "Blockers" }
    },
    {
      type: "input",
      element: {
        type: "plain_text_input",
        action_id: "next_week",
        multiline: true,
        placeholder: { type: "plain_text", text: "What's planned for next week?" }
      },
      label: { type: "plain_text", text: "Next Week's Focus" }
    }
  ]
};

Лучшие практики

  1. Консистентность важнее красоты — используй один и тот же шаблон
  2. Executive summary всегда первым — руководители читают только его
  3. Честность в оценках — лучше предупредить о рисках заранее
  4. Конкретика вместо общих фраз — "завершено 75%" вместо "почти готово"
  5. Action items с владельцами — каждый риск и issue должен иметь ответственного
  6. Архивируй отчёты — они нужны для post-mortem и планирования
  7. Адаптируй под аудиторию — разная глубина для разных читателей

FAQ

What does the status-report-template skill do?

Эксперт по статус-отчётам. Используй для создания шаблонов отчётов, executive summaries и project dashboards.

How do I install status-report-template?

Run npx skills add https://github.com/dengineproblem/agents-monorepo --skill status-report-template in your project. The skills CLI detects the agents you use and copies the skill into the right folder. For Claude Code you can also place the skill folder at ~/.claude/skills/status-report-template/ (personal) or .claude/skills/status-report-template/ (project).

Which AI agents can use status-report-template?

Any agent that supports the open Agent Skills format (a folder with a SKILL.md file), including Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, Windsurf, Cline, OpenCode and more.

Is status-report-template safe to install?

No partner security audit is available yet. Skills can run commands and scripts, so read the SKILL.md and any bundled files before installing.

Who maintains status-report-template?

It is published by dengineproblem in dengineproblem/agents-monorepo. It has 82 recorded installs.

More from dengineproblem/agents-monorepo

View all →

social-media-marketing

dengineproblem/agents-monorepo

Эксперт по SMM. Используй для стратегий в Instagram, Facebook, TikTok, LinkedIn, контент-планов и community management.

Marketing & SEO1.2K installs

frontend-design

dengineproblem/agents-monorepo

Open the skill to read its SKILL.md instructions.

Frontend & Design288 installs

video-marketing

dengineproblem/agents-monorepo

Open the skill to read its SKILL.md instructions.

Marketing & SEO259 installs

k6-load-test

dengineproblem/agents-monorepo

Эксперт k6 нагрузочного тестирования. Используй для performance testing, load scenarios и stress tests.

Testing & QA181 installs

b2b-saas-marketing

dengineproblem/agents-monorepo

Open the skill to read its SKILL.md instructions.

Marketing & SEO141 installs

seo-expert

dengineproblem/agents-monorepo

Open the skill to read its SKILL.md instructions.

Marketing & SEO129 installs

Popular docs & writing skills

View category →

grill-with-docs

mattpocock/skills

A relentless interview to sharpen a plan or design, which also creates docs (ADR's and glossary) as we go.

Docs & Writing1.2M installs

lark-markdown

open.feishu.cn

飞书 Markdown:查看、创建、上传、编辑和比较飞书中的原生 Markdown 文件。当用户要操作飞书 Markdown 文件,或比较其远端版本及本地草稿时使用。纯本地 Markdown 文件操作不触发本 skill。不负责将 Markdown 导入为飞书在线文档,也不负责文件搜索、权限、评论、移动、删除等云空间管理操作。

Docs & Writing778.7K installs

writing-beats

mattpocock/skills

Writing, exploit; assemble raw material into a journey of beats, grounding each term before a beat leans on it.

Docs & Writing490.7K installs

writing-shape

mattpocock/skills

Writing, exploit: shape raw material into an article, paragraph by paragraph.

Docs & Writing490.2K installs

writing-fragments

mattpocock/skills

Writing, explore: mine raw fragments, no structure yet.

Docs & Writing489.6K installs

writing-for-agents

mattpocock/skills

Writing documents for agents. Use when creating or editing skills, or modifying AGENTS.md or CLAUDE.md.

Docs & Writing479.3K installs